Saudi Aramco applies the world's most stringent acceptance criteria for shale shakers. In the 2025 SINO 27 / SINO 45 projects, RSD's GBS205 competed head-to-head with the international leading brand's products, and the gap was significant:
1. Key Operating Conditions. Drilling-fluid density 75 pcf (approx. 1.20 g/cm³), viscosity 61, flow rate >1000 GPM.
2. Measured Comparison (same drilling crew, same drilling-fluid system, same drilling period):
| Parameter | RSD/GBS205 | FLC2000-4 |
| G-force | ≥8 | ≥7 |
| Screening area | 3.4 m² | 2.9 m² |
| Motion trajectory | Bidirectional TranslationalEllipse | Linear motion |
| Processing capacity | 1397 GPM | 900 GPM |
3. Real Benefits to the Customer:
- Zero Mud Loss: During fast drilling, losing 150 BBL of mud per hour to overflow is normal for DERRICK; RSD's GBS205 achieved zero mud overflow throughout.
- No Water Washing Required: Water washing dilutes the drilling fluid and adds to the downstream burden. The GBS205 requires no water washing — saving water, process steps, and labor.
- 45% Longer Screen Life: Longer service life directly cuts downtime for screen changes and screen procurement cost.
- Higher Screen Mesh Count: Under the same conditions, RSD/GBS205 runs normally with 120+120+80+80+80 mesh screens installed, whereas DERRICK's can only reach 70+70+70+70 mesh — delivering cleaner drilling fluid and faster ROP.
- Reduced Equipment Investment: 2 units of RSD/GBS205 can replace a 3-unit DERRICK/SWACO combination, saving 30% on equipment procurement cost.
4.Commercial Value. Saudi Aramco, KOC and PDO have listed RSD as a preferred supplier;
