Saudi Aramco applies the world's most stringent acceptance criteria for shale shakers. In the 2025 SP96 / SINO 45 projects, RSD's GBS204 competed head-to-head with HYPERPOOL, and the gap was significant:
1. Key Operating Conditions. Drilling-fluid density 75 pcf (approx. 1.20 g/cm³), viscosity 61, flow rate >1000 GPM.
2. Measured Comparison (same drilling crew, same drilling-fluid system, same drilling period):
| Parameter | RSD/GBS204 | HYPERPOOL |
| G-force | ≥8 | ≥7 |
| Screening area | 2.7 m² | 2.1 m² |
| Motion trajectory | Bidirectional Translational Ellipse | Linear motion |
| Processing capacity | 1117 GPM | 600 GPM |
- Zero Mud Loss: During fast drilling in the 6th spud (Sept. 30 – Oct. 5), with a throughput of 246 gal (15 L/s), only two shale shakers were operated — Shaker #1 and #2 were used alternately, while Shaker #3 was used throughout the entire well section. Shaker #1 and #2 kept API 120 screens installed, and Shaker #3 kept API 140 screens.
On Oct. 3, Shaker #1 replaced its first API 120 screen after 225 hours of service; the screen maintained continuous operation (15–25 [recorded]); inlet flow to Shaker #1 and #2 was below 30%, while Shaker #3 (RSD) inlet flow reached 100%. Throughout the operation, with Shaker #3 fitted with API 140 mesh screens, no mud overflow occurred; the deck inclination was stably set at 0°, the dry-zone length on the screen was approx. 1170 mm, and all operating indicators met the on-site requirements.
- No Water Washing Required: Water washing dilutes the drilling fluid and adds to the downstream drying burden. The GBS204 requires no water washing — saving water, process steps, and labor.
- Reduced Equipment Investment: 2 units of RSD/GBS204 can replace a 3-unit HYPERPOOL combination, saving 30% on equipment procurement cost.
- Lower Operating Cost: Long screen service life saves operating cost. (Drilling-fluid cost)
4. Commercial Value. Saudi Aramco, KOC and PDO have listed RSD as a preferred supplier;